Contact Info
Hear From Our Clients
Your driveway takes a beating from Halfmoon Beach’s freeze-thaw cycles, summer heat, and daily traffic. When it’s cracked, uneven, or puddling after every rain, you’re not just dealing with an eyesore—you’re watching your property value drop.
A properly installed asphalt driveway changes everything. You get smooth, safe access to your home year-round. No more scraping your car’s undercarriage on broken pavement or explaining away those embarrassing potholes to visitors.
The right contractor makes the difference between a driveway that lasts 8-10 years and one that serves you for 20+. When the base is prepared correctly and the asphalt is installed to handle local weather conditions, you’re investing in decades of reliable performance.
We’ve been serving Halfmoon Beach and the greater Capital District since 1999. We’re not the contractors who show up with a quote and disappear—we’re the ones your neighbors call back for their next project.
Owner-operated means you work directly with Mike Morgan from your first call through final cleanup. No middlemen, no miscommunication, just straightforward answers about what your driveway needs and what it’ll cost.
We understand Halfmoon Beach’s unique challenges. The soil conditions, drainage requirements, and weather patterns that can make or break a paving job. That local knowledge, combined with proper equipment and quality materials, is why our driveways hold up when others start failing.
First, we assess your existing driveway and drainage situation. If there’s old asphalt, we remove it completely—no paving over problems that’ll resurface later. The base gets excavated to proper depth and graded for optimal water runoff.
Next comes the foundation work that most homeowners never see but makes all the difference. We install and compact a stone base that can handle Halfmoon Beach’s freeze-thaw cycles without shifting or settling. Proper drainage gets built in from the start.
Finally, we install 3-4 inches of quality asphalt in ideal weather conditions. No rushing because rain’s coming, no working in temperatures that compromise the installation. When we’re done, you get a driveway that looks great and performs reliably for decades, not just until the next harsh winter.
Ready to get started?
Every Morgan Construction driveway starts with proper site preparation designed for Halfmoon Beach’s challenging conditions. We account for the area’s clay-heavy soils, seasonal moisture changes, and temperature swings that can destroy inferior installations.
Our asphalt mix is specifically chosen to handle Northeast weather patterns. The aggregate blend and binder ratios work together to resist cracking from freeze-thaw cycles while maintaining flexibility during summer heat. This isn’t generic asphalt—it’s engineered for durability in our climate.
You also get comprehensive drainage solutions built into every installation. Halfmoon Beach’s terrain and rainfall patterns require careful attention to water management. We grade and crown your driveway to direct runoff away from your foundation while preventing the standing water that leads to premature pavement failure.
Most Halfmoon Beach homeowners invest $4,000-$8,000 for a complete driveway replacement, depending on size and complexity. A typical 12×40 foot driveway runs $2,500-$4,400 for quality asphalt installation.
The wide price range reflects different approaches to the work. Cheaper quotes often mean thinner asphalt, minimal base preparation, or shortcuts that cost you more long-term. Our pricing includes complete removal of old materials, proper base installation, and 3-4 inches of quality asphalt designed to last 20+ years.
We provide detailed written estimates that break down every aspect of the work. No hidden fees, no surprise charges, no pressure tactics. Just honest pricing for quality work that protects your investment.
The optimal paving season in Halfmoon Beach runs from May through September when temperatures consistently stay above 50°F and rainfall is manageable. We avoid paving in wet conditions or when overnight temperatures might drop below 40°F.
Spring installations (May-June) give your new asphalt the full summer to cure properly before winter stress. Fall paving (August-September) works well too, but we need adequate time for the asphalt to set before freeze-thaw cycles begin.
Weather timing isn’t just about convenience—it’s critical for long-term performance. Asphalt installed in poor conditions won’t compact properly, leading to premature cracking and failure. We’d rather reschedule than compromise your investment.
A properly installed asphalt driveway in Halfmoon Beach typically lasts 15-20 years with basic maintenance, or 8-12 years if neglected. The key factors are installation quality, drainage, and regular sealcoating every 3-5 years.
Halfmoon Beach’s freeze-thaw cycles are particularly hard on asphalt. Water gets into small cracks, freezes, expands, and creates bigger problems. Driveways installed with proper base preparation and drainage handle these conditions much better than quick installations over inadequate foundations.
Regular maintenance makes a huge difference. Sealcoating protects against water infiltration, UV damage, and chemical spills. Small crack repairs prevent bigger problems. With proper care, we’ve seen our installations perform well for two decades or more.
Most driveway replacements in Halfmoon Beach don’t require permits if you’re staying within existing boundaries and not changing drainage patterns. However, new driveways, significant expansions, or work affecting town right-of-way typically need approval.
We handle permit research and applications when required. The Town of Halfmoon building department can clarify requirements for your specific situation. Permit fees typically run $100-$500 for residential projects, depending on scope.
It’s worth checking even if you think no permit is needed. Working without required permits can create problems during home sales or insurance claims. We’ll verify requirements and handle the paperwork so you don’t have to worry about compliance issues.
Asphalt overlay means installing new asphalt over your existing driveway, while full replacement involves removing old materials and starting fresh. Overlay costs $2-4 less per square foot but only works when the existing base is solid and properly graded.
Most Halfmoon Beach driveways with significant cracking, settling, or drainage issues need full replacement. Overlay over a failing base just postpones problems—often making them worse. If your current driveway has potholes, major cracks, or standing water, overlay won’t fix the underlying issues.
We evaluate each situation honestly. Sometimes overlay makes sense for driveways in good structural condition that just need a fresh surface. But when the base has failed or drainage is poor, full replacement is the only solution that makes financial sense long-term.
The most important maintenance step is sealcoating every 3-5 years to protect against water infiltration and UV damage. In Halfmoon Beach’s climate, this protection is essential for preventing freeze-thaw damage that can destroy asphalt quickly.
Address small cracks immediately before they become big problems. Water getting into cracks and freezing causes rapid deterioration. Simple crack sealing costs much less than major repairs later. We recommend annual inspections to catch issues early.
Keep your driveway clean of debris, leaves, and snow buildup. Avoid using metal shovels or sharp tools that can gouge the surface. Don’t let vehicles leak oil or fluids—clean spills quickly to prevent staining and surface damage. With proper care, your investment will serve you well for decades.
Other Services we provide in Halfmoon Beach