Contact Info
Hear From Our Clients
You get a smooth, durable surface that handles everything from delivery trucks to teenage drivers learning to parallel park. No more dodging potholes in your own driveway or worrying about cracked asphalt making your property look neglected.
Your investment actually protects itself. Properly installed asphalt with the right base preparation and compaction techniques means fewer emergency repairs and longer stretches between maintenance. You’re not just getting pavement—you’re getting peace of mind that your surface can handle New York’s brutal freeze-thaw cycles without falling apart.
The result? A professional-looking driveway or parking lot that adds value to your property instead of becoming a constant headache and expense.
We’ve been handling paving projects in the Starks Knob area for over two decades. When you call, you talk directly to the owner—not a sales rep who’s never actually installed asphalt.
This isn’t a corporate operation with layers of management. We’re a local business that’s built our reputation one project at a time. The same person who gives you the estimate is the one who shows up to oversee your job and make sure it’s done right.
You’re working with someone who understands that your driveway needs to survive more than just summer traffic—it needs to handle New York winters, spring thaw, and everything in between.
First, we evaluate your site and explain exactly what needs to happen. No surprises, no hidden steps that suddenly appear halfway through the job. You know the timeline, the process, and what to expect before we start.
Site preparation comes next—proper grading, base material, and drainage considerations that most contractors skip. This foundation work determines whether your asphalt lasts 15 years or starts cracking after three. We don’t cut corners here because we know you’ll be the one dealing with the consequences.
Installation day means professional equipment, proper compaction, and attention to details like transitions and drainage. You get clear communication about access, timing, and when you can use your new surface. The job isn’t finished until you’re satisfied with the result.
Ready to get started?
Your paving project includes proper site evaluation, base preparation, and installation using materials designed for local climate conditions. We handle everything from small residential driveways to larger commercial parking lots, with the same attention to detail regardless of project size.
In the Starks Knob area, this means understanding soil conditions, drainage patterns, and how seasonal temperature swings affect asphalt performance. We’ve worked here for decades and know which techniques work and which ones fail when winter hits.
You also get direct communication throughout the process, clear timelines, and emergency response capability when urgent repairs are needed. This isn’t just about laying asphalt—it’s about creating a surface that serves your property well for years to come.
Most residential driveway projects take 1-2 days from start to finish, depending on size and site conditions. Commercial parking lots typically require 3-5 days, but weather and complexity can affect timing.
The actual paving happens relatively quickly—it’s the preparation work that takes time. Proper base preparation, grading, and material delivery scheduling determine your project timeline more than the asphalt installation itself. We provide realistic timelines upfront so you can plan accordingly.
You can usually drive on new asphalt within 24-48 hours, but we recommend waiting longer for heavy vehicles or high-traffic situations. Temperature and humidity affect curing time, so we adjust recommendations based on current conditions.
Proper base preparation is everything in climates with freeze-thaw cycles. Without adequate drainage and a properly compacted base, water gets underneath the asphalt and causes heaving, cracking, and potholes when temperatures fluctuate.
Material selection matters too. We use asphalt mixes designed for temperature extremes and proper compaction techniques that create dense, water-resistant surfaces. Rushing the installation or using inadequate materials leads to premature failure when winter weather hits.
Timing also plays a role. Asphalt installation works best when ground temperatures are above 50°F and conditions are dry. We plan projects during optimal weather windows to ensure proper bonding and compaction that will last through multiple winter seasons.
Most residential driveway projects in the area range from $4,000 to $8,000, depending on size, site conditions, and material requirements. Commercial parking lots vary widely based on square footage and complexity, typically running $3-8 per square foot.
Several factors affect pricing: existing surface removal, base preparation needs, drainage requirements, and access challenges. A straightforward rectangular driveway costs less than one requiring extensive grading or working around landscaping and utilities.
We provide detailed written estimates that break down material, labor, and site preparation costs. No surprises or hidden fees—you know exactly what you’re paying for before work begins. Emergency repairs and rush jobs carry premium pricing due to scheduling and material coordination requirements.
Late spring through early fall offers the best conditions for asphalt installation. Ground temperatures need to stay consistently above 50°F for proper compaction and curing. May through October typically provides the most reliable weather windows.
Summer heat can actually make installation more challenging, so we often schedule work for early morning hours during peak temperature periods. Fall paving works well if completed before ground temperatures drop, but timing becomes more critical as winter approaches.
Winter paving is possible for emergency repairs using specialized cold-weather materials, but it’s not ideal for new installations. We plan major projects during optimal weather windows and can handle urgent repairs year-round when needed.
Sealcoating every 2-3 years protects asphalt from water penetration, UV damage, and chemical exposure. In areas with harsh winters like Starks Knob, this preventive maintenance significantly extends surface life and prevents costly repairs.
Crack filling should happen promptly when small cracks appear. Water infiltration through cracks causes the most damage during freeze-thaw cycles, turning minor issues into major problems. Early intervention keeps small repairs from becoming expensive reconstruction projects.
Regular cleaning and avoiding harsh de-icing chemicals also help preserve asphalt surfaces. Sand provides better traction than salt without the chemical damage, and removing debris prevents moisture retention that accelerates deterioration. Proper maintenance can extend asphalt life to 20+ years in this climate.
We understand specific soil conditions, drainage patterns, and climate challenges that affect paving success in the Starks Knob area. This knowledge translates to better material selection, proper installation techniques, and realistic maintenance recommendations.
Direct communication with us eliminates miscommunication and ensures accountability. When issues arise, you deal with the person who did the work, not a customer service representative reading from a script. We also provide faster response times for emergency repairs.
We’ve built our business on reputation and referrals from the community we serve. This creates strong incentives for quality work and customer satisfaction that larger, corporate operations often lack. You’re working with someone who has to face their neighbors if something goes wrong.
Other Services we provide in Starks Knob